Wooden Sticks

作者: jlhy8001 分类: 未分类 发布时间: 2014-10-25 10:38 阅读: 2,168

Problem Description

There is a pile of n wooden sticks. The length and weight of each stick are known in advance. The sticks are to be processed by a woodworking machine in one by one fashion. It needs some time, called setup time, for the machine to prepare processing
a stick. The setup times are associated with cleaning operations and changing tools and shapes in the machine. The setup times of the woodworking machine are given as follows:

(a) The setup time for the first wooden stick is 1 minute.
(b) Right after processing a stick of length l and weight w , the machine will need no setup time for a stick of length l’ and weight w’ if l<=l’ and w<=w’. Otherwise, it will need 1 minute for setup.

You are to find the minimum setup time to process a given pile of n wooden sticks. For example, if you have five sticks whose pairs of length and weight are (4,9), (5,2), (2,1), (3,5), and (1,4), then the minimum setup time should be 2 minutes since there is
a sequence of pairs (1,4), (3,5), (4,9), (2,1), (5,2).

Input

The input consists of T test cases. The number of test cases (T) is given in the first line of the input file. Each test case consists of two lines: The first line has an integer n , 1<=n<=5000, that represents the number of wooden sticks
in the test case, and the second line contains n 2 positive integers l1, w1, l2, w2, …, ln, wn, each of magnitude at most 10000 , where li and wi are the length and weight of the i th wooden stick, respectively. The 2n integers are delimited by one or more
spaces.

Output

The output should contain the minimum setup time in minutes, one per line.

Sample Input

Sample Output

这道题把我害的挺惨的

This article is automatically posted by WP-AutoPost : WordPress自动采集发布插件
如何获取并设置Cookie采集需要登录才能浏览的内容?,WP-AutoPost

如果觉得我的文章对您有用,请随意打赏。您的支持将鼓励我继续创作!

发表评论

电子邮件地址不会被公开。 必填项已用*标注